Saha | Business Park |
---|---|
Konum | Singapore |
Alt kategori | MALL |
İnşa edildiği tarih: | 2014 |
Açıldığı tarih: | 2016 |
Uygulama | installation of ceramics and stone materials inside and outside |
Başlangıç ve bitiş tarihi | 2015/2016 |
Uygulama Türü | Installatıon of floor and wall coverıngs |
Müşteri | Shimizu Corporation |
Yüklenici şirket | Shimizu Corporation |
Tesisatçılar | CSC Holdings Limited, Yangzijian International (S) Pte Ltd |
Mimarlar | DCA Architect |
MAPEI Distribütörü | Mapei Far East Pte Ltd |
MAPEI Koordinasyonu | Ryan Liaw (Mapei Far East, Singapore) |
Açıklama | Soon after the completion of MBC phase 1, major issues on the tile bonding surfaced. Installation materials were supplied by Laticrete. Tiles from the toilets debonded causing potential danger. At the request of the owner, Mapei did a thorough site inspect |