Obra | Kuala Lumpur International Airport 2 (KLIA2) |
---|---|
Localização | Sepang, Malaysia |
Subcategoria | AEROPORTO |
Construído em | 2013 |
Inaugurado em | 2013 |
Aplicação | Kuala Lumpur International Airport 2 (KLIA2) |
Data de início e fim | 2013 |
Tipo de aplicação | Pavimentos/revestimentos |
Proprietário | Malaysia Airports Holding Berhad |
Empreteiro | WCT Construction S/B & UEMC-Bina Puri |
Aplicador | Hon & Cheah Construction & Tiling Sdn Bhd / Sun-Trident Sdn Bhd |
Arquitetos | Arkitek AAP |
Distribuidor MAPEI | Mapei Malaysia Sdn Bhd |
Descrição | MAPEI tiling installation in Kuala Lumpur International Airport 2 (KLIA2) Integrated Complex. Integrated complex comprises the transportation hub, Express Rail Link terminal, shopping mall, boarding and departure lounges and linkway passages. The Client wanted a top-of-the-range tile adhesive that is able to withstand the stresses of heavy traffic of people, trolleys and electric carts. |