Realta_logo_white-120

Desde 1991, Realtà MAPEI ha sido una herramienta básica para comunicar información y soluciones de construcción a los que aprecian y usan los productos MAPEI. Disponible sólo en inglés:

En el foco

Foco en productos

N° 33 - 5/10/2021

Quick turn-arounds and deep-fill voids are no match for these new self-levelers.

Proyectos

N° 33 - 4/29/2021

This project represented the first time that the Mapelastic TU system was used on a major tunnel construction project in the U.S.

Arquitectura Proyectos

N° 33 - 5/20/2021

To help recreate a Scandanavian-style get-away in the Gatineau hills, the specifier's chose one of MAPEI's Mapeheat heated floor systems

Artículos destacados

Arquitectura Proyectos

N° 33 - 5/18/2021

Constructed with 1928 poured-in-place technology, the façade of the Oroville Theatre was in need of a facelift.

Foco en productos

N° 33 - 5/4/2021

MAPEI innovation has created a soil conditioner for the TBM process that is less harmful to the environment than existing options.

Responsabilidad social Arquitectura Sostenibilidad Noticias

N° 33 - 5/13/2021

MAPEI’s program can help projects qualify for green building standard and certification programs.

Arquitectura Cultura y deportes Foco en productos

N° 33 - 5/7/2021

If it is played on a court, MAPEI has the system solution to improve the play surface.

Proyectos Entrevistas Noticias

N° 33 - 5/17/2021

17 years after work started, the system of dams designed to stop high tides made its debut. Several MAPEI were especially designed to build the system.

Proyectos

N° 33 - 5/14/2021

Prominent hydropower projects worldwide feature MAPEI technology

Arquitectura Proyectos

N° 33 - 5/20/2021

To help recreate a Scandanavian-style get-away in the Gatineau hills, the specifier's chose one of MAPEI's Mapeheat heated floor systems

Arquitectura Proyectos

N° 33 - 5/18/2021

Constructed with 1928 poured-in-place technology, the façade of the Oroville Theatre was in need of a facelift.

Proyectos Entrevistas Noticias

N° 33 - 5/17/2021

17 years after work started, the system of dams designed to stop high tides made its debut. Several MAPEI were especially designed to build the system.

Proyectos

N° 33 - 5/14/2021

Prominent hydropower projects worldwide feature MAPEI technology

Keep in touch

Subscribe to our newsletter to get Mapei news