ISOLASTIC

Elasticising latex mixed with KERABOND, KERABOND T and ADESILEX P10. When KERABOND, KERABOND T and KERABOND PLUS are mixed with ISOLASTIC they form a high-performance, highly deformable adhesive with extended open time (C2E/S2).
When ADESILEX P10 is mixed with ISOLASTIC (dilution rate 1:1 with water), it forms a high-performance, highly deformable adhesive with extended open time (C2E/S1).
TECHNICAL DATA OF KERABOND/KERABOND T/KERABOND PLUS+ISOLASTIC:
Pot life of mix: more than 8 hours.
Open time: 20 minutes.
Waiting time before grouting:
– on walls: 4-8 hours;
– on floors: 24-36 hours.
Set to light foot traffic: 24-36 hours.
Ready for use: approx. 14 days.
Deformability according to EN 12004: S2 - highly deformable (ADESILEX P10 + ISOLASTIC diluted 1:1 with water - S1 deformable).
EMICODE: EC1 Plus - very low emission.
Application: KERABOND/KERABOND T/KERABOND PLUS + ISOLASTIC: N° 4, 5 or 6 notched trowel.
ADESILEX P10/SOLASTIC diluted 1:1 with water: N° 4, 5 or 6 notched trowel.
Storage: 24 months. Protect from frost.
Consumption: 1-2 kg/m².
Packaging: 5 and 25 kg drums.

Certifications

Related documentation

Technical data sheet
Download
Safety Data Sheet
Download
Specifications
Download
EPD
Download
GEV
Download
P.A.S.S.
Download

Last Projects ISOLASTIC

Category icon TOURISM AND WELLNESS

2015/2016

Caramell Premium Resort

Bükfürdő, Hungary

Installation of floors, New building, Waterproofing

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2019/2020

St. Paul's Catholic Day Nursery

Tai Po, Hong Kong

Masonry restoration, Floor/wall covering

Category icon COMMERCIAL FACILITIES

2018/2020

Commercial Bay

Auckland, New Zealand

Installation of floors, Sealants application, Surface preparation, Waterproofing

Category icon TOURISM AND WELLNESS

2016/2017

Swimming pool Ägeribad, Oberägeri

Oberägeri, Switzerland

Installation of floor and wall coverings

Keep in touch

Subscribe to our newsletter to get Mapei news