Područje zahvata | Business Park |
---|---|
Lokacija | Singapore |
Podkategorija | SHOPPING CENTER |
Godina izgradnje | 2014 |
Otvoreno | 2016 |
Opis izvođenih radova | installation of ceramics and stone materials inside and outside |
Datum početka i završetka | 2015/2016 |
Vrsta radova | Polaganje podnih i zidnih obloga |
Investitor | Shimizu Corporation |
Glavni izvođač radova | Shimizu Corporation |
Izvođač radova | CSC Holdings Limited, Yangzijian International (S) Pte Ltd |
Projektant | DCA Architect |
MAPEI distributer | Mapei Far East Pte Ltd |
MAPEI koordinator | Ryan Liaw (Mapei Far East, Singapore) |
Opis izvođenih radova | Soon after the completion of MBC phase 1, major issues on the tile bonding surfaced. Installation materials were supplied by Laticrete. Tiles from the toilets debonded causing potential danger. At the request of the owner, Mapei did a thorough site inspect |